ZHENGZHOU HENGTONG FURNACE CO,. LTD
1100℃ Max. Dip Coater or Bridgman Growth with Atmosphere Controlled 2’’ Tube
  • 1100℃ Max. Dip Coater or Bridgman Growth with Atmosphere Controlled 2’’ Tube
0

1100℃ Max. Dip Coater or Bridgman Growth with Atmosphere Controlled 2’’ Tube

HT-CBF is a Programmable Dip Coater with 2" Tube Furnace and color touch screen controller. It is designed for R&D Lab to prepare various optical or epitaxial films from the liquid solution under controlled temperature and atmosphere environment. Dipping rate, pulling rate, dwell time, and life cycle can be set up via the touch screen control. The solution is located at the bottom of the sealed tube at room temperature, and the sample can go through a hot zone up to 800oC (to protect the stainless steel wire and sample clamp) under various gas atmosphere or vacuum for achieving high-quality epitaxial films.

  • Price
    0
total sales0
evaluate0
Qty
- +

Pledge: genuine guarantee,speed refund,gift insurance,seven days no reason to return

  • Product Details
  • HT-CBF is a Programmable Dip Coater with 2" Tube Furnace and color touch screen controller. It is designed for R&D Lab to prepare various optical or epitaxial films from the liquid solution under controlled temperature and atmosphere environment. Dipping rate, pulling rate, dwell time, and life cycle can be set up via the touch screen control. The solution is located at the bottom of the sealed tube at room temperature, and the sample can go through a hot zone up to 800oC (to protect the stainless steel wire and sample clamp) under various gas atmosphere or vacuum for achieving high-quality epitaxial films.   

    SPECIFICATIONS:

    Dip Coater

    Working Voltage: 110V AC   or 220V )

    Max. Power Consumption: 50W

    6"(L) x 4"(W) Touch Screen Display

    Three stages pulling speed control

    Total stoke length: 620mm

    Pulling Speed: 1-200 mm/min programmable with an accuracy of +/- 0.05%

    Dwelling time at constant temperature zone: 1-999 seconds

    Lower or higher pulling or dipping speed is available upon request at extra cost

    Tube Furnaces

    Working Voltage: 110V AC or 220V

    Max. Power Consumption: 2KW

    Tube size: 2" (OD) x 24"(L)

    Heating Zone Length: 12" (300mm)

    Max. heating temperature: 1200°C

    Continuous working temperature: 1100°C

    30 segment programmable digital temperature controller

    Note:   Max. working temperature for dip coating is limited by pulling wire

    Included stainless steel wire  Max. working temperature < 800°C

    Ni-Cr-Al wire ( not included )   Max. working temperature < 1100°C

    Platinum wire ( not included )  Max. working temperature 1200°C , 1600°C

    Pulling wire

    Three sets of Ni-SS pulling wire are included. Max. The working temperature is 800°C.

    Optional pulling wire for higher working temperature:

    Ni-Cr-Al wire max. working temperature: 1100C

    Platinum wire  max. working temperature: 1200 - 1600C

    Stage Length

    Lower Stage (Pre-heat zone): 236mm

    Center Stage (Constant temperature zone): 150mm

    Upper Stage (Cooling zone): 234mm

    Product Dimensions

    560mm(L) x 470mm(W) x 1435mm(H)

    Warranty

    One Year limited warranty with lifetime support.

    Consumable parts such as processing tubes, o-rings and heating elements are not covered by the warranty.

    Net Weight

    105 kg (230 lbs)

     


    HT-CBF is a Programmable Dip Coater with 2" Tube Furnace and color touch screen controller. It is designed for R&D Lab to prepare various optical or epitaxial films from the liquid solution under controlled temperature and atmosphere environment. Dipping rate, pulling rate, dwell time, and life cycle can be set up via the touch screen control. The solution is located at the bottom of the sealed tube at room temperature, and the sample can go through a hot zone up to 800oC (to protect the stainless steel wire and sample clamp) under various gas atmosphere or vacuum for achieving high-quality epitaxial films.   

    SPECIFICATIONS:

    Dip Coater

    Working Voltage: 110V AC   or 220V )

    Max. Power Consumption: 50W

    6"(L) x 4"(W) Touch Screen Display

    Three stages pulling speed control

    Total stoke length: 620mm

    Pulling Speed: 1-200 mm/min programmable with an accuracy of +/- 0.05%

    Dwelling time at constant temperature zone: 1-999 seconds

    Lower or higher pulling or dipping speed is available upon request at extra cost

    Tube Furnaces

    Working Voltage: 110V AC or 220V

    Max. Power Consumption: 2KW

    Tube size: 2" (OD) x 24"(L)

    Heating Zone Length: 12" (300mm)

    Max. heating temperature: 1200°C

    Continuous working temperature: 1100°C

    30 segment programmable digital temperature controller

    Note:   Max. working temperature for dip coating is limited by pulling wire

    Included stainless steel wire  Max. working temperature < 800°C

    Ni-Cr-Al wire ( not included )   Max. working temperature < 1100°C

    Platinum wire ( not included )  Max. working temperature 1200°C , 1600°C

    Pulling wire

    Three sets of Ni-SS pulling wire are included. Max. The working temperature is 800°C.

    Optional pulling wire for higher working temperature:

    Ni-Cr-Al wire max. working temperature: 1100C

    Platinum wire  max. working temperature: 1200 - 1600C

    Stage Length

    Lower Stage (Pre-heat zone): 236mm

    Center Stage (Constant temperature zone): 150mm

    Upper Stage (Cooling zone): 234mm

    Product Dimensions

    560mm(L) x 470mm(W) x 1435mm(H)

    Warranty

    One Year limited warranty with lifetime support.

    Consumable parts such as processing tubes, o-rings and heating elements are not covered by the warranty.

    Net Weight

    105 kg (230 lbs)